Rules and the Engineering Review ​

Why it matters ​

A drawing can look perfect and be wrong: a rack an inch through the roof, a fire path too narrow, a block of storage no aisle reaches. The platform checks the design all the time, so you find these on screen and not on site.

In plain words ​

Think of a careful senior engineer looking over your shoulder. They do not stop you working. They point and say "that one's 300 mm too tall, it needs one level fewer". That is a finding.

Every finding has a severity:

SeverityMeans
CriticalBreaks a hard rule: outside the building, overlapping, through the roof.
MajorWrong for the operation: a dead-end aisle, a door nobody can reach.
MinorWorth a look.
InfoFor the record.

And every finding names the number that fixes it, never just "error".

What gets checked ​

AreaExamples
BoundaryAn object outside the building; a road outside the site. "Move it 1 100 mm inside."
CollisionTwo things in the same place; a machine across a room's wall.
HeadroomA rack top above the clear height, with the number of levels that would fit.
Flue and spacingFlues under the AS 4084 minimum; aisles under the advisory minimum.
AccessA rack face with no aisle; a dead-end aisle; a route that runs through racking.
FitA load too wide, too tall or too heavy for its bin.
SiteA road leaving the site; a door without room for a truck in front.

In Warehouse Studio ​

Issues ​

The inspector's Issues tab checks the whole layout on demand. Click Validate layout. The tab lists every violation with its severity and the object it concerns, or says No violations.

Some checks also run as you work. A zone drawn outside the building is refused at once, with the distance that would fix it.

The Engineering Review ​

The Review tab, also opened by Area on the Analysis tab, measures the design in nine dimensions:

DimensionMeasured as
CapacityPallet positions.
Storage DensityPositions per m².
Travel EfficiencyMetres travelled per handling unit. Needs an operating profile.
ExpandabilityShare of usable floor still free.
SafetyBoundary, collision and hosting findings.
ComplianceSpacing, alignment and constraint findings.
Automation ReadinessNot available yet.
Cost ImplicationsLabour hours per operating day. Needs an operating profile.
Overall Engineering ScoreDeliberately not given.

Each dimension carries a status:

StatusMeans
OKNo finding.
MeasuredA value, with nothing to judge it against.
AttentionMajor or minor findings.
DegradedAt least one critical finding.
N/ANeeds something that does not exist yet, and says what.

Why there is no overall score

A single score would have to weigh capacity against travel against cost. That weighting is a business decision, not an engineering fact, and the platform will not invent it. You see every dimension with its value and the drivers behind it.

Try it ​

In Sandbox, drag a storage zone so it pokes outside the building. Read the refusal. Then raise a rack spec's top beam above the clear height and read the headroom finding.

Words you just learned

Finding · severity: critical, major, minor, info · headroom · Engineering Review · status.