Skip to content

Glossary ​

Every term the course uses, in plain words, with the lesson that teaches it.

A ​

Address — A bin's name, written row / bay / level, for example ROW-A01/B03/L2. Bays and levels count from 1. Bins and levels

Advisory — A readiness item that does not stop a run. The run assumes something and says so. Running the warehouse

AI assisted — The mark on everything the copilot created. Talking to the copilot

Aisle — The lane in front of a rack row that a forklift drives along. Written A in a lay pattern. Racking 101

Apron — The yard space in front of a dock door where a truck backs up. Aisles, routes and roads

Assumed — A value nobody measured. A provenance, and a word the platform uses whenever it fills a gap. Operating profiles

B ​

Back-to-back pair — Two rack rows placed back to back with a flue between, sharing an aisle on each side. Written RR. Racking 101

Band (95 %) — The range a difference would fall in 95 times out of 100. If it excludes zero, the difference is real. Comparing two runs

Baseline — The scenario or run you compare everything else against. Projects and scenarios

Bay — The space between two rack frames. A warehouse in ten minutes

Beam — The horizontal steel bar a pallet sits on.

Benchmark — A provenance: a figure from industry data or a similar site.

Bin — One opening in the racking: one bay at one level. Bins and levels

Block plan — A first layout of a whole facility as rectangles, one per function, before any racking. Writing a good brief

Block stack — Pallets stacked on the floor in lanes, without racking. Racking 101

Blocks the run — A readiness item the simulation cannot work around.

C ​

Calibrate — Tell the platform the real distance between two points on an underlay, so it knows the picture's scale. Bringing drawings in

Calibrated — A provenance: a figure tuned so the simulation matches the real site.

Capacity — How many positions the design holds, counted in its unit (pallet, shelf or floor). Capacity

Capacity loss — The positions lost between nominal and usable: to columns, clearances and shape. Capacity

Case — A carton of eaches, as it came from the factory. Also called a carton. A warehouse in ten minutes

Clear height — The height from the floor to the lowest thing under the roof. Racks and their loads must stay below it. The building and its grid

Clone — An exact copy of a scenario that you can change freely. Projects and scenarios

Column grid — The regular pattern of roof columns, named by letter and number lines. The building and its grid

Copilot — The AI assistant that edits the scenario through the platform's own tools. Talking to the copilot

Counterbalance truck — The ordinary forklift, which balances its load with a heavy rear. Needs wide aisles.

Cross aisle — An aisle cut across long rows so forklifts can cross between them. Aisles, routes and roads

Cut-off — The time after which a new order goes on the next departure. Operating profiles

D ​

Dead position — A position no forklift can reach, because no aisle serves its face. Shown, never quietly counted. Capacity

Demolish — A phase: standing today, coming out. Phases

Departure — A scheduled outbound truck. Orders are picked to meet it.

Design vehicle — The largest vehicle a route or aisle must suit. Aisles, routes and roads

Discrete-event simulation — A simulation that jumps from one event to the next (a truck arrives, a pallet lands) rather than ticking second by second. Simulation in plain words

Dispatch floor — See Marshalling.

Distribution — A description of how a number varies: constant, uniform, triangular, and so on. Operating profiles

Dock door — A large door at truck-floor height where trucks are unloaded or loaded. Doors, rooms and machines

Double-deep — Racking two pallets deep. The rear pallet is reached only after the front one is removed.

DXF — The common exchange format for CAD drawings. Exports and reports

E ​

Each — One single item. A warehouse in ten minutes

Elevation — The view of one whole side of the building or of a rack row. Sheets, sections and 3D

Engineering Library — The client's shared, versioned templates. The Engineering Library

Engineering Review — The nine-dimension measurement of a design, with no overall score. Rules and the Engineering Review

Envelope — The overall size and weight of one load. Load types

Exclusion zone — Floor nothing may use.

Existing — A phase: standing today.

F ​

Finding — A rule check's result, with its severity and the number that fixes it. Rules and the Engineering Review

Floor positions — Painted pallet squares on a staging or marshalling floor. Throughput space, not storage. Zones

Flue — A gap in racking that lets sprinkler water fall and heat rise. AS 4084 sets minimums. Racking 101

Footprint — The outline of the building, or of anything, seen from above.

Frame — Two uprights braced together.

Future — A phase: reserved for later, kept clear, not counted in capacity. Phases

G–K ​

Gantt chart — A chart with one row per truck and time running across. Reading the results

Gross area — The whole building floor. Capacity

Headroom — The space between the top of the load and the clear height.

Horizon — How many days a run simulates. Running the warehouse

Inbound — Everything to do with goods arriving.

KPI — Key performance indicator: one measured figure, such as dock wait or truck fill.

L ​

Labour estimate — Hours a week by process, from volume × time, with no queueing. The labour estimate

Lateness cause — One of nine reasons a truck left late. They sum to the total. Reading the results

Lay pattern — The sequence of rows and aisles across a zone, such as R A RR A RR A R. Racking 101

Lead — How long before its departure an order should start being picked.

Level — One shelf height in racking. Level 1 is the floor.

Load type — What one bin holds: items across × deep × layers, on a pallet or loose. Load types

M ​

Marshalling — The dispatch floor, where packed orders wait for their truck. Zones

Matched streams — Two runs that used the same seed and settings, so each replication can be compared with its twin. Comparing two runs

MHE — Materials handling equipment: forklifts and similar machines.

Model — The one description of the warehouse that every view reads. How the platform thinks

N–O ​

Nominal capacity — What a zone would hold with nothing in the way.

Observed — A provenance: measured on the real site.

Order type — A profile describing a kind of customer order and its departures. Operating profiles

Outbound — Everything to do with goods leaving.

Overhang — A load deeper than its rack frame, sticking into the aisle or flue.

P ​

P90 — The value nine items in ten stay below. Used for waits and lateness. Reading the results

Pack — The conversion between each, case and pallet: 12 eaches a case, 48 cases a pallet.

Pallet — A wooden platform with goods stacked on it, lifted by a forklift.

Percentage points (pp) — The difference between two percentages. 12 % to 6 % is −6 pp.

Phase — Whether an object is existing, proposed, future or to be demolished. Phases

Pick face — The low, easy-to-reach storage pickers take from. In Warehouse Studio, a Picking zone.

Picking — Collecting the goods for one order.

Playback — Drawing a finished run on the 3D model, on a clock. Playback in 3D

Position — One pallet's space in the racking. Also called a location or slot.

Product group — A profile describing goods that are packed and stored alike.

Project — One facility for one client, holding scenarios.

Proposed — A phase: part of this design. The default.

Provenance — Where a number came from: assumed, benchmark, observed or calibrated.

Put-away — Moving a received pallet into a storage position.

R ​

Rack spec — The description of one bay of racking: sizes, levels, beam heights. Rack specs and storage systems

Reach truck — A narrow-aisle forklift whose forks reach up and forward.

Readiness — The pre-run check that lists what blocks a run and what it will assume.

Real (difference) — A difference whose 95 % band excludes zero.

Receiving floor — See Staging.

Reconciled — The stock ledger balanced: opening + in − out = on hand, at every shift change.

Replenishment — Moving stock from reserve down to the pick face.

Replication — One playing of the simulated week. Several replications show how much was luck. Simulation in plain words

Reserve storage — The main racking, where stock waits until needed.

Resource pool — A group of people or machines that do the same work on the same shifts. Operating profiles

Row — Bays joined end to end. Written R in a lay pattern.

S ​

Scenario — One version of a facility. Projects and scenarios

Section — A vertical slice through the building. Sheets, sections and 3D

Seed — The number that starts the simulation's dice. The same seed replays the same rolls.

Selective racking — Racking one pallet deep, where every pallet can be reached directly. The most common kind.

Severity — How serious a finding is: critical, major, minor or info.

Sheet — The drawing as it will be printed, on a paper size at a scale. Sheets, sections and 3D

Shift — A block of working time, such as Early 06:00–14:30.

Shelving — Hand-height shelves for cartons, counted in shelf locations.

Site — The land around the building: yard and roads.

Staging — The receiving floor, where unloaded goods wait to be checked and put away. Zones

Stale run — A run whose scenario has changed since. Its results stay true for the inputs it used.

Standard deviation (sd) — How much a figure varied across replications.

Storage system — The decision to fill a zone with one rack spec, in a pattern and direction. Rack specs and storage systems

T–Z ​

Tare — The weight of the pallet itself.

Template — A saved rack spec, load type or datasheet in the Engineering Library.

Truck fill — The share of a departing truck's pallet spaces actually used.

Truck profile — A profile describing arriving (or departing) trucks.

Underlay — A picture or PDF placed behind the drawing to trace over. Bringing drawings in

Upright — A vertical steel post of a rack frame.

Usable area — Gross floor minus columns and non-storage zones. Capacity

Utilisation — The share of available time that was busy.

Warm-up — Simulated days that are run but not measured.

Within the noise — A difference whose band includes zero: it may be luck.

Zone — An area of floor with one job, such as storage or staging. Zones

Warehouse Studio — a digital engineering tool for warehouse design.